Operating and Surgery department included 12 prefabricated operating rooms for a total of 20,000m2. Surgery and OR design was completed in 2007.
Operating and Surgery department included 12 prefabricated operating rooms for a total of 20,000m2. Surgery and OR design was completed in 2007.